Cyntergy AEC
  • Cyntergy AEC

HVAC Design & Replacement, Building 340

Little Rock AFB, AR

Completion Date:

-2010

Construction Cost:

-$461,000

Provided:

  • -Architecture
  • -Engineering
  • -Architecture
  • -Engineering
Under an AE Open End Contract, Cyntergy AEC provided services to upgrade the HVAC system in this 25,900 SF building used for survival equipment maintenance, folding and storage. One vital aspect of this project included a system design that could maintain a constant level of humidity, which is mandatory to prevent static electricity build up, which damages parachute material rendering it dangerous and unuseable.