Cyntergy AEC
  • Cyntergy AEC
  • Cyntergy AEC

VA Primary Care Facility Expansion, Phase II

Fayetteville, AR

Completion Date:

-2007

Construction Cost:

-$1.6 Million

Provided:

  • -Architecture
  • -Construction Administration
  • -Engineering
  • -Architecture
  • -Construction Administration
  • -Engineering
The Cyntergy AEC/McSorley Architects Design Team was awarded this total small business set-aside project that expanded the Primary Care Building on the east side by roughly 7,000 SF. Essentially the same functional areas previously designed by Cyntergy for the Primary Care Facility medical areas during Phase I were utilized.