Cyntergy AEC
  • Cyntergy AEC

Federal Express New Ground Facility (D-B)

Tulsa, OK

Completion Date:

-2008

Construction Cost:

-$5.5 Million

Provided:

  • -Architecture
  • -Construction Administration
  • -Engineering

As the design partner to Key Construction, Cyntergy AEC is providing full architectural and multidiscipline design services on this ground-up, design-build project, which consists of a 90,000 SF new facility. Part of the facility will have a dock arrangement, with the remainder allowing for vehicle entry and exit into the facility, as wall as a seperate, detached fuel system station.