Cyntergy AEC
  • Cyntergy AEC

Federal Express New Ground Facility (DB)

Tulsa, OK

Completion Date:

-2008

Construction Cost:

-$5.5 Million

Provided:

  • -Architecture
  • -Construction Administration
  • -Engineering
  • -Architecture
  • -Construction Administration
  • -Engineering

As the design partner to Key Construction, Cyntergy AEC provided full architectural and multidiscipline design services on this ground-up, design-build project, which consisted of a 90,000 SF new facility. Part of the facility has a dock arrangement, with the remainder allowing for vehicle entry and exit into the facility, as well as a seperate, detached fuel system station.