Tulsa, OK
-2008
-$5.5 Million
As the design partner to Key Construction, Cyntergy AEC provided full architectural and multidiscipline design services on this ground-up, design-build project, which consisted of a 90,000 SF new facility. Part of the facility has a dock arrangement, with the remainder allowing for vehicle entry and exit into the facility, as well as a seperate, detached fuel system station.