Cyntergy AEC
  • Cyntergy AEC
  • Cyntergy AEC
  • Cyntergy AEC

Oklahoma Air Logistics Center Main Lobby Remodel, Bldg 3001

Tinker AFB, OK

Completion Date:

-2006

Construction Cost:

-$450,000

Provided:

  • -Architecture
  • -Engineering

Cyntergy AEC provided the required AE services to remodel the Oklahoma Air Logistics Center’s main lobby inside historic building 3001 at Tinker AFB. The goal was to bring it up to date with a “high tech” look, while maintaining the historical reference to its significance, personnel, and activity over the years. Security features were also overhauled with updated pass/ID devices as well as increased ratings and security control at exterior vestibule doors and at new fire doors at the rear of the lobby.

 

WINNER OF THE 2007 AFMC MERIT AWARD FOR CONCEPT DESIGN.