Fuel Cell Hangar Reconfiguration, B3102

Tinker AFB, OK

Completion Date:

-2004

Construction Cost:

-$1.8 Million

Provided:

  • -Architecture
  • -Engineering

Cyntergy AEC provided AE services for the reconfiguration of an existing 128,715 SF aircraft hangar to accommodate a 43,214 SF center bay fuel cell hangar with adjacent areas separated by a fire rated wall of masonry construction. The project consisted of upgrading the existing AFFF fire suppression system to ETL 98-8 and UFC standards.